EVerest EvseManager phase-switch path has unsynchronized shared-state access race condition
everest-core
Affected versions
| Product | Affected | Fixed in |
|---|---|---|
| EVerest everest-core |
| No fix yet |
Original description
EVerest is an EV charging software stack. Versions prior to 2026.02.0 have a data race (C++ UB) triggered by an A 1-phase ↔ 3-phase switch request (`ac_switch_three_phases_while_charging`) during charging/waiting executes concurrently with the state machine loop. Version 2026.02.0 contains a patch.
From the CVE record · GitHub_M